Masonry of walls from small -piece gas -sized blocks is carried out mainly in accordance with the recommendations and requirements, which are taken into account when laying walls from traditional materials, but also has some distinctive features. Before starting the laying of walls from such a material, it is necessary to lay the foundation and build the basement walls with a height of more than 40 cm, which is due to a feature of the properties and operation of the gas silicate. After that, you should check the level of the walls and waterproof both the foundation and the basement. If the height difference is small, it can be eliminated during the masonry, otherwise, it is recommended to leve the base until the masonry of the blocks starts.
The masonry process begins by laying corner blocks with the determination and adjustment of their verticality and horizontal. For the convenience of performing work, it is recommended to stretch the guide cord between the already installed blocks. It should be borne in mind that the mortar layer for laying the first row should be at least 2 cmdl the possibility of eliminating the irregularities of the basement or aligning the height of the walls. The quality of the rest of the masonry will depend on how high -quality the first row of blocks will be laid. Gas soster blocks should not form vertical seams, so in each overlying row the blocks are laid with a displacement. To strengthen the entire masonry, it is recommended to put the reinforcement in the solution every 2-4 rows. And to eliminate the irregularities of the masonry, you can use the grinding board or a shirt.