The education and expenditure in the Ministry of Own Funds of Economic Stimulations was carried out according to the same principles as in construction and installation organizations, but with the following features: the standards for deductions to the funds from profit were determined from the total balance sheet for all types of activities; The growth rate of labor productivity was taken into account only in the field of construction production, and the wage fund – total for all types of activities.
The ministry created centralized funds of economic incentives.
In the conditions of self -sufficiency of the ministry, a direct economic dependence appeared between the results of its activities as a whole and the production units subordinate to it: construction organizations, enterprises of the industrial base and transport.
The contributions from profit to the budget were made by organizations and enterprises at the place of their location in the form of a fee for production funds and in the form of a free balance of profit. The amount of contributions to the ministry as a whole was defined as the amount of payments of organizations subordinate to it and was adjusted in accordance with the consolidated quarter and annual balances of the Ministry of the Ministry. The funds that were not used by the end of the year were not subject to seizure, were left to the disposal of the ministry and were used for the corresponding expenses in subsequent periods.
In obtaining the maximum size of profit with the least labor and material costs and the driving economic force of the economic mechanism is concluded, since the capabilities of the production and social development of labor collectives, their material encouragement, depend on the mass of profit.
The study of the provisions of the new economic mechanism at all levels of management – from the central apparatus of the ministry to members of the brigades and the application of these provisions allowed to reduce the number of simultaneously under construction and concentrate the efforts of the builders at the entered facilities. The number of facilities under construction over two years (from 1976 to 1978) decreased by 13% (from 1142 to 995), the average duration of their construction is 11.5%, the volume of incomplete construction production is 12%. As a result, if in 1976. The entry plan for the main capacities and objects was executed by 84%, then in 1977 and 1978. This underput was compensated, including early commissioning of other facilities into account of the plan of subsequent years, and the plan for commodity construction products as a whole is overfulfilled by 17 million. rub.